Biwater International

Biwater International: Erbil Water Treatment Works, Iraq

Customer Scope

Construction of a 600 MLD water treatment plant to increase drinking water capacity and improve continuity of supply for more than 1.3 million people in the city of Erbil in the Kurdistan region of Iraq.


GPS Scope:

3 conventional MCC’s with PLC monitoring for pumping stations at Diwajin, Ifraz and Khabat, forming part of the Erbil distribution network.

  • Duration 16 weeks
  • Contract Circa £250,000
  • Completion April 2019
  • Erbil Back to Back MCC
  • Erbil MCC
  • Erbil MCC
Prev

Erbil Back to Back MCC.

Next

Project Delivery / Outcome

As emergency-reconstruction works the priority was speed, so the 3 individual MCCs were fast tracked, with the first unit designed built and tested in 8 weeks, and the entire project completed within 16 weeks.


Specification

  • Design: G-Flex C, front access bottom cable entry, Khabat back to back with front and back access and bottom cable entry 
  • MCC Metres: 15 m (total)
  • Separation: Form 4A Type 2
  • IP rating: IP 54
  • Current rating(s): 650A - 1300A – 2750A
  • Fault rating(s): 50 kA/1 Sec
  • PLC system: Mitsubishi
  • Communications: Ethernet

CASE STUDIES

Browse more projects

UKAS accredited ISO Management

UKAS accredited ISO management systems ensure our legal compliance, business conduct and operating procedures meet the high standards required by our customers.

UKAS accredited ISO Management
ISO management systems

Take the next step

Get an instant budget cost and outline design for your next motor control centre project.

Try our MCC configurator
MCC configurator

Innovation and Quality in Process Control

Discover the GPS difference

Contact Us