Menu
Configure your MCC
Configure your MCC

Get an instant budget cost and outline design for your next motor control centre project.

Get Started

Wessex Water: Thornford WwTW

Upgrade of Thornford WwTW

Customer Scope

Upgrade of WwTW to increase capacity for population growth and meet new standards for phosphorus removal.


GPS Scope:

Design a larger replacement MCC with an uprated specification - to fit the existing building.

  • Duration 11 Weeks
  • Industry Sector Regulated Water
  • Contract Circa £180,000
  • Completion March 2019
  • Space saving U shape MCC design
  • Space saving U shape MCC design
Prev

Space saving U shape MCC design.

Next

Project Delivery / Outcome

GPS developed a U shape MCC with a unique combination of front access and back to back sections within a single modular design to maximise the use of the available space – avoiding the construction / cost of a new asset


Specification

  • Design: G-Flex Modular
  • MCC Metres: 18 m
  • Separation: Form 4
  • IP rating: IP 54
  • Current rating: 650A
  • Fault rating: 20 kA/1 Sec
  • PLC system: Siemens
  • Communications: Profinet / Ethernet

CASE STUDIES

Browse more projects

UKAS accredited ISO Management

UKAS accredited ISO management systems ensure our legal compliance, business conduct and operating procedures meet the high standards required by our customers.

UKAS accredited ISO Management
ISO management systems

Take the next step

Get an instant budget cost and outline design for your next motor control centre project.

Try our MCC configurator
MCC configurator

Innovation and Quality in Process Control

Discover the GPS difference

Contact Us