• New construction mine water treatment plant
  • New construction mine water treatment plant
New construction mine water treatment plant

Back to back MCC and automation for mine dewatering process

  • £400,000 Contract value
  • 6 monthsProject duration
  • 30 metresLV assemblies
  • MCC1 No
  • IntegrationPLC SCADA
  • WwTW update
  • WwTW update
  • WwTW update
WwTW update

Second-generation modular design, installed and ready to connect in less than 4 hours

  • £170,000 Contract value
  • 7 monthsProject duration
  • 8 metresLV assemblies
  • MCC1 No
  • Reconstruction of 30 MLD WTW
  • Reconstruction of 30 MLD WTW
  • Reconstruction of 30 MLD WTW
Reconstruction of 30 MLD WTW

Control system for chemical dosing, dissolved air flotation and rapid gravity filtration processes.

  • £1.0 millionContract value
  • 40 weeksProject duration
  • 100 metresLV assemblies
  • MCC6 No
  • LVDB1 No
  • New construction 90 MLD WTW
  • New construction 90 MLD WTW
  • New construction 90 MLD WTW
New construction 90 MLD WTW

Control solution for cost reduction based on standard electrical designs and pre-engineered G-Flex Modular enclosures.

  • £400 kContract value
  • 36 weeksProject duration
  • 45 metresLV assemblies
  • MCC4 No
  • LVDB1 No
  • Reconstruction of WTW - Sierra Leone
  • Reconstruction of WTW - Sierra Leone
  • Reconstruction of WTW - Sierra Leone
Reconstruction of WTW - Sierra Leone

Complete control system for new water treatment works including power distribution, MCCs, control desks, local control and annunciator panels.

  • £340 kContract value
  • 8 weeksProject duration
  • 30 metresLV assemblies
  • MCC3 No
  • LVDB1 No
  • Reconstruction of 600 MLD WTW - Iraq
  • Reconstruction of 600 MLD WTW - Iraq
  • Reconstruction of 600 MLD WTW - Iraq
Reconstruction of 600 MLD WTW - Iraq

Control system for water distribution network pumping stations

  • £250 kContract value
  • 6 monthsProject duration
  • 15 metresLV assemblies
  • MCC3 No
  • Refurbishment of District Pumping Station
  • Refurbishment of District Pumping Station
  • Refurbishment of District Pumping Station
Refurbishment of District Pumping Station

Power distribution upgrade

  • £600 kContract value
  • 48 weeksProject duration
  • 18.5 metresLV assemblies
  • LVDB4 No
  • IntegrationPLC SCADA
  • WwTW refurbishment and new construction
  • WwTW refurbishment and new construction
  • WwTW refurbishment and new construction
WwTW refurbishment and new construction

Supply of power and process elements for existing and new build water treatment and renewable energy assets

  • £2.8 millionContract value
  • 36 monthsProject duration
  • 185 metresLV assemblies
  • MCC7 No
  • LVDB5 No
  • IntegrationPLC SCADA
  • WwTW refurbishment and technology update
  • WwTW refurbishment and technology update
  • WwTW refurbishment and technology update
WwTW refurbishment and technology update

Control system for process compliant with Ammonia permitting regulations

  • £450 kContract value
  • 28 weeksProject duration
  • 36 metresLV assemblies
  • MCC3 No
  • LVDB1 No
  • WwTW upgrade for Phosphorus removal
  • WwTW upgrade for Phosphorus removal
  • WwTW upgrade for Phosphorus removal
WwTW upgrade for Phosphorus removal

Hybrid MCC design for uprated specification and larger dimensions to fit existing building, avoiding new construction

  • £180 kContract value
  • 11 weeksProject duration
  • 18 metresLV assemblies
  • MCC1 No
  • Construction of Thermal Hydrolosis - Advanced Anaerobic Digestion plants for sister WwTW's
  • Construction of Thermal Hydrolosis - Advanced Anaerobic Digestion plants for sister WwTW's
  • Construction of Thermal Hydrolosis - Advanced Anaerobic Digestion plants for sister WwTW's
Construction of Thermal Hydrolosis - Advanced Anaerobic Digestion plants for sister WwTW's

Fully automated control system to optimize digester performance and biogas production

  • £1.9 millionContract value
  • 24 monthsProject duration
  • 115 metresLV assemblies
  • MCC5 No
  • LVDB1 No
  • IntegrationPLC SCADA
  • Construction of 1.5GW WwTW Advanced Anaerobic Digestion Plant
  • Construction of 1.5GW WwTW Advanced Anaerobic Digestion Plant
  • Construction of 1.5GW WwTW Advanced Anaerobic Digestion Plant
Construction of 1.5GW WwTW Advanced Anaerobic Digestion Plant

Control system for AAD plant supplying process power for waste water treatment works

  • £1.6 millionContract value
  • 24 monthsProject duration
  • 60 metresLV assemblies
  • MCC5 No
  • LVDB1 No
  • IntegrationPLC SCADA
  • Construction of 3MW food waste Anaerobic Digestion Plant
  • Construction of 3MW food waste Anaerobic Digestion Plant
Construction of 3MW food waste Anaerobic Digestion Plant

Hybrid Form 2-4 MCC managing processes from de-packaging and feedstock to digestion and export

  • £300 kContract value
  • 8 monthsProject duration
  • 12.5 metresLV assemblies
  • MCC1 No
  • Biogas plant expansion and upgrade
  • Biogas plant expansion and upgrade
  • Biogas plant expansion and upgrade
Biogas plant expansion and upgrade

Form 2 control system for digesters, pasteurisation and biogas upgrading

  • £63 kContract value
  • 14 weeksProject duration
  • 6.5 metresLV assemblies
  • MCC1 No
  • Brewery waste anaerobic digestion plant
  • Brewery waste anaerobic digestion plant
  • Brewery waste anaerobic digestion plant
Brewery waste anaerobic digestion plant

Space saving hybrid MCC based on Form 4 and modular design principles within a Form 2 panel

  • £200 kContract value
  • 24 weeksProject duration
  • 7.5 metresLV assemblies
  • MCC1 No
  • Construction of butter production plant
  • Construction of butter production plant
Construction of butter production plant

Form 2 control system for blending-mixing, recovery, storage and packaging processes

  • £167 kContract value
  • 18 weeksProject duration
  • 36 metresLV assemblies
  • MCC13 No
  • IntegrationPLC
  • WwTW upgrade with DfMA delivery
  • WwTW upgrade with DfMA delivery
  • WwTW upgrade with DfMA delivery
WwTW upgrade with DfMA delivery

Replacement MCC delivered as a packaged plant-room including kiosk, sub-frame and electrical fit out

  • £180 kContract value
  • 28 weeksProject duration
  • 6 metresLV assemblies
  • MCC1 No
  • IntegrationPLC HMI
  • WwTW upgrade utilising DfMA plant
  • WwTW upgrade utilising DfMA plant
  • WwTW upgrade utilising DfMA plant
WwTW upgrade utilising DfMA plant

Supply of MCC packaged plantroom including electrical fit out fibre optic and radio comms systems

  • £130 kContract value
  • 24 weeksProject duration
  • 7.5 metresLV assemblies
  • MCC1 No
  • IntegrationHMI
  • Construction of wind farm grid park
  • Construction of wind farm grid park
  • Construction of wind farm grid park
Construction of wind farm grid park

Power distribution to rotating stabiliser

  • £110,000 Contract value
  • 26 weeksProject duration
  • 3.6 metresLV assemblies
  • LVDB1 No
  • Shipborne marine growth prevention system
  • Shipborne marine growth prevention system
  • Shipborne marine growth prevention system
Shipborne marine growth prevention system

Control system for cooling water electrochlorination protection process

  • £120,000 Contract value
  • 16 weeksProject duration
  • 10 metresLV assemblies
  • MCC4 No
  • IntegrationPLC
  • Offshore platform desalination plant
  • Offshore platform desalination plant
  • Offshore platform desalination plant
Offshore platform desalination plant

Withdrawable modular MCC for potable water maker

  • £50,000 Contract value
  • 12 weeksProject duration
  • 3.2 metresLV assemblies
  • MCC1 No
  • Infrastructure testing facility
  • Infrastructure testing facility
  • Infrastructure testing facility
Infrastructure testing facility

450 power distribution and control panels serving adjsutable test platforms

  • £415,000 Contract value
  • 12 monthsProject duration
  • metresLV assemblies