HERERenewable Energy | GPS Group
  • Construction of Thermal Hydrolosis - Advanced Anaerobic Digestion plants for sister WwTW's
  • Construction of Thermal Hydrolosis - Advanced Anaerobic Digestion plants for sister WwTW's
  • Construction of Thermal Hydrolosis - Advanced Anaerobic Digestion plants for sister WwTW's
Construction of Thermal Hydrolosis - Advanced Anaerobic Digestion plants for sister WwTW's

Fully automated control system to optimize digester performance and biogas production

  • £1.9 millionContract value
  • 24 monthsProject duration
  • 115 metresLV assemblies
  • MCC5 No
  • LVDB1 No
  • IntegrationPLC SCADA
  • Construction of 1.5GW WwTW Advanced Anaerobic Digestion Plant
  • Construction of 1.5GW WwTW Advanced Anaerobic Digestion Plant
  • Construction of 1.5GW WwTW Advanced Anaerobic Digestion Plant
Construction of 1.5GW WwTW Advanced Anaerobic Digestion Plant

Control system for AAD plant supplying process power for waste water treatment works

  • £1.6 millionContract value
  • 24 monthsProject duration
  • 60 metresLV assemblies
  • MCC5 No
  • LVDB1 No
  • IntegrationPLC SCADA
  • Biogas plant expansion and upgrade
  • Biogas plant expansion and upgrade
  • Biogas plant expansion and upgrade
Biogas plant expansion and upgrade

Form 2 control system for digesters, pasteurisation and biogas upgrading

  • £63 kContract value
  • 14 weeksProject duration
  • 6.5 metresLV assemblies
  • MCC1 No
  • Construction of wind farm grid park
  • Construction of wind farm grid park
  • Construction of wind farm grid park
Construction of wind farm grid park

Power distribution to rotating stabiliser

  • £110,000 Contract value
  • 26 weeksProject duration
  • 3.6 metresLV assemblies
  • LVDB1 No