HEREFood and Beverage | GPS Group
  • Construction of 3MW food waste Anaerobic Digestion Plant
  • Construction of 3MW food waste Anaerobic Digestion Plant
Construction of 3MW food waste Anaerobic Digestion Plant

Hybrid Form 2-4 MCC managing processes from de-packaging and feedstock to digestion and export

  • £300 kContract value
  • 8 monthsProject duration
  • 12.5 metresLV assemblies
  • MCC1 No
  • Brewery waste anaerobic digestion plant
  • Brewery waste anaerobic digestion plant
  • Brewery waste anaerobic digestion plant
Brewery waste anaerobic digestion plant

Space saving hybrid MCC based on Form 4 and modular design principles within a Form 2 panel

  • £200 kContract value
  • 24 weeksProject duration
  • 7.5 metresLV assemblies
  • MCC1 No
  • Construction of butter production plant
  • Construction of butter production plant
Construction of butter production plant

Form 2 control system for blending-mixing, recovery, storage and packaging processes

  • £167 kContract value
  • 18 weeksProject duration
  • 36 metresLV assemblies
  • MCC13 No
  • IntegrationPLC